Thursday, 28 June 2018

Moving On

The roof rack is now reinstalled on the truck, the lights are fitted and wired. The back of the cab is painted.

I also refitted the mirrors and wired the heating for them, the side repeaters are now in place as well.

Sorry about the picture quality, the lighting in the workshop isn't the best.