Sunday 30 August 2020

Roof Nearly Finished Now

 Another few days work completed on the roof, now all the solar panels are installed and wired, the sat Tv system is installed and wired.

I managed to get a bit of a walkway down the center using treadplate, I think it would be difficult to walk down there stepping over the aircon units but it can be done.

The only thing left to do on the roof now is a few antennas for comms and wireless etc.

The white area you see in front of the rear aircon unit is the space for these other antennas.















Sunday 16 August 2020

More Internal Insulation

 Now that the external paneling is finished I added some more insulation on the inside.







Solar Panels and Aircon

 There is 9 solar panels in total, these are wired in three banks of three utilizing three separate controllers for a total of 2.4Kw.

The air conditioners are Truma Aventa Comfort units, they are inverter type units that cool and heat. These are controlled the trauma iNet system that also controls the Truma Combi D6E water an hot air heating.

There is also a Maxx Fan in the roof over the bedroom, for ventilation without running the aircon.

The other strange thing sneaking into the pictures is the Oyster 5 satellite system (without the dish fitted)










The Roof

The roof will be full of tech once it is finished,  You cha see her that the sealing rings for the aircon units have been installed.  On the left of the picture, the rails for the mounting of solar panels have been installed.


 




Spare Wheel Mounts Finished

So that's the spare wheel lifts finished, I am happy to say they worked out very well.